Contact Details

Phone:+86-13533953390

Email:1021031110@qq.com

Add:2A1501, Skyworth Innovation Valley, Shiyan Street, Bao'an District, Shenzhen, China

Plant:A2 Huacai Chemical Park, Wengyuan County, Shaoguan City, Guangdong Province, China

Baiyunshan Pharmaceutical Factory has leveled itself
Detailed Description

Baiyunshan Pharmaceutical Factory has leveled itself

Baiyunshan Pharmaceutical Factory has leveled itself

Baiyunshan Pharmaceutical Factory has leveled itself

Baiyunshan Pharmaceutical Factory has leveled itself

    Baiyunshan Pharmaceutical Factory has leveled itself
Detailed description
Baiyunshan Pharmaceutical Factory Self-leveling Baiyunshan Pharmaceutical Factory Self-leveling (3mm)
Thickness: 1.0mm 2.0mm 3.0mm
Surface form: bright type anti-slip type
Service life: 1.0mm: 8 years 2.0mm: 10 years 3.0mm: 15 years
Floor characteristics:
 Flat and seamless, wear-resistant and pressure-resistant, acid-alkali-resistant, diverse in color, chemical-resistant, durable, easy to clean, and impact-resistant.
Scope of application:
 (1) GMP drug factories, hospitals, clean rooms;
 (2) Electronics factory, instrument control room, food processing plant, cold room, freezer room;
Construction process:
(1) Waterproof treatment: the ground on the first floor must be waterproofed;
(2) Plain treatment: do a good job of polishing, repairing and dusting according to the condition of the plain ground;
(3) Epoxy primer: use permeability and adhesion extra strong epoxy primer to roll coat to enhance surface adhesion;
(4) Epoxy coating: Add an appropriate amount of quartz sand to the epoxy resin and coat it evenly several times with a trowel;
(5) Epoxy batching: According to the actual needs, several steps of construction are required, and it is required to be flat without holes, without batch knife printing and sanding stamping;
(6) Self-flowing flat paint: use a self-leveling epoxy topcoat to evenly coat it, and the overall ground will be bright and clean after completion, with uniform color and no hollowing;
(7) Construction completion: 24 hours before the person can be loaded, and 72 hours before heavy pressing. (25°C prevails, and the low temperature opening time needs to be moderately extended)

Good Gloor*TPU Build

  • Headquarters Add:
    2A1501, Skyworth Innovation Valley, Shiyan Street, Bao'an District, Shenzhen, China

    Shaoguan Factory:
    A2 Huacai Chemical Park, Wengyuan County, Shaoguan City, Guangdong Province, China

    Hubei Factory:
    No.2, Fanhu Industrial Park, Panjiawan Town, Jiayu County, Hubei Province, China

    Shandong factory:
    No.1 Yan Temple Industrial Park, Dongchangfu District, Liaocheng, Shandong Province, China

  • Mobile:
    +86-13533953390(Material Line)

    Mobile:
    +86-18938884699(Engineering Line)

    Phone:
    +86-0755-27119890

    Email:
    1021031110@qq.com

COPYRIGHT © 2025 Shenzhen Tong Pu New Material Co.,Ltd