Generally in the floor paint construction after a period of time after some construction of epoxy floor paint coating film will produce problems with the adhesion between the grass-roots level, which will make the coating of small pieces of detachment or detachment from the ground as a whole. Such a phenomenon is often floor paint manufacturers in the construction of floor paint there are many factors did not pay attention to cause.

The main reasons are as follows:

1, in the construction of the field before the pre-treatment is not appropriate, the ground and the rest of the impurities such as oil, water solubles, rust, etc., the construction environment cleanup is not clean.

2, one of the pre-treatment to the floor paint construction when the interval is too long, resulting in dust impurities continue to appear on the ground surface.

3, There is also in the treatment of the ground is not dry to start construction operations. Need to know if the construction on the wet ground, there will be epoxy floor paint layer from the ground risk exists.

4, the ground material base and epoxy floor paint coating combination is not ideal, the reason is because the base material smooth degree is high, not easy to adhere to it, which may also be epoxy floor paint coating configuration is not appropriate, which need to be configured according to the local environmental factors.

5, did not do drying treatment of the ground layer, or drying treatment is insufficient, resulting in the phenomenon of unstable shedding of the coating when the floor paint manufacturers carry out the construction of floor paint.

Preventive measures:

1, floor paint construction unit of the ground about to carry out the construction of the surface of the ground for cleaning, such as encountering a high degree of smoothness of the ground is sandblasted, or with sand quality on its treatment, so that its roughness enhanced to facilitate the construction.

2, in the treatment of the ground such as air-drying can not be too long, usually 3-4 hours or so, you have to start construction. You can also dry the ground at the same time.

3, floor paint manufacturers in the construction of floor paint to choose a good geological suitability with its grass-roots materials, to ensure that its adhesion to adapt to the material of the ground.

Good Gloor*TPU Build

  • Headquarters Add:
    2A1501, Skyworth Innovation Valley, Shiyan Street, Bao'an District, Shenzhen, China

    Shaoguan Factory:
    A2 Huacai Chemical Park, Wengyuan County, Shaoguan City, Guangdong Province, China

    Hubei Factory:
    No.2, Fanhu Industrial Park, Panjiawan Town, Jiayu County, Hubei Province, China

    Shandong factory:
    No.1 Yan Temple Industrial Park, Dongchangfu District, Liaocheng, Shandong Province, China

  • Mobile:
    +86-13533953390(Material Line)

    Mobile:
    +86-18938884699(Engineering Line)

    Phone:
    +86-0755-27119890

    Email:
    1021031110@qq.com

COPYRIGHT © 2025 Shenzhen Tong Pu New Material Co.,Ltd